Skip to the calculator
+48 12 000 00 00 Book a meeting

Wiecha studio · Kraków

Services and prices

We design and build single-family houses within 60 km of Kraków. Every stage has a fixed price in the contract, and you pay for it only after it has been approved.

Services and prices per square meter
ServiceWhat it includesPrice
House designconcept with a 1:100 model, building design, structure, building systems, building permitfrom 260 zł/m²
Construction to your designseven stages from the foundations to the garden, a site manager, a log you can follow as it happensfrom 5,200 zł/m²
Design and buildeverything in one studio; the design comes with a 30% discountfrom 5,380 zł/m²

2025 prices, excluding the lot, utility connections and furniture. We write the exact price of every stage into the contract after the concept.

Price your house

The calculator works the way our cost estimate does: from the costs of the seven stages of the Hillside House, scaled to your floor area and finish standard.

Floors
Finish standard
Lot
Garage
Outdoors
Scope

Your cost estimate by stage

    Book a meeting on your lot

    At the meeting we turn this rough figure into a cost estimate for your house.

    What the price includes

    • A site manager and a construction log you can follow as it happens, with entries and photos.
    • All materials and labor in each of the seven stages, debris removal, scaffolding.
    • Stage approvals with your inspector and reports from the building systems tests.
    • As-built documents and the notice of completion.
    • A five-year warranty on the structure, roof, windows and building systems.

    What the price does not include

    • The lot, utility connections and official fees.
    • Loose furniture, appliances and decorative lighting.
    • Design changes after the contract is signed (we price them separately, before the work).

    Questions

    Can the price go up during construction?

    No. The price of each stage in the cost estimate becomes the price in the contract. It changes only if you change the design.

    When do I pay?

    After each stage is approved, once the site manager and your inspector have signed the report. Before work starts, you pay only for the design.

    How long does construction take?

    We build a house of about 180 m² in 10–12 months, with a winter break. The calculator shows the time for each stage.

    Can you build a house to someone else’s design?

    Yes. First we check the design and the lot, then we price the build in the same stages.